Structural engineers in Chiswick, working across London

Corroded steel beam and decayed timber joists exposed where a ceiling has been opened up

Freeholder consent reports for a licence to alter

If you own a leasehold flat and want to remove a wall or make other structural changes, your lease almost certainly requires the freeholder's consent. Most freeholders and managing agents will want an engineer's report before they give it.

Watch: structural alterations, and consent for flats

A 3-minute film on structural alterations, including what a freeholder consent report covers, what you receive and how the process works.

Jump to:Removing a wall 0:19Leasehold flats 1:15What you receive 1:25How it works 1:45

Why your freeholder wants an engineer's report

In a block of flats, a wall in your flat can be holding up the homes above it. The freeholder is responsible for the whole building, so they need to see how the work keeps it safe.

Why a freeholder asks for an engineer's report Elevation through a block of flats: a flat above, your flat, a flat below and the common parts on the ground floor. The wall in your flat carries the floors above down to the foundations. Our report shows the new steel beam and padstones that take over, how the load reaches the foundations, and the check on the flats above and below and the common parts. New steel beam Flat above Your flat Flat below Common parts Laytoe StructuresBlock of flats, elevationNot to scale

What is a licence to alter?

It is the freeholder's written consent to alterations in a leasehold flat, sometimes called a right of alteration. Before giving it for structural work, such as removing a wall, most freeholders and managing agents want an engineer's report.

Your lease, your solicitor or the managing agent will confirm exactly what is needed. Our report covers the structural side.

Why freeholders ask for a report

A freeholder is responsible for the whole building and for the other flats in it. Before agreeing to an alteration, sometimes called a licence to alter or a right of alteration, they need to be satisfied that the work will not weaken the building or affect the flats above and below.

What our report covers

Freeholder consent reportContents
  1. The existing structure around the proposed work, and how loads currently travel through it.
  2. What you plan to change, and whether the wall is load-bearing.
  3. The new support needed, such as beams, posts and padstones, with calculations where required.
  4. How the work should be carried out safely, including temporary support.
  5. Any effect on the rest of the building, the common parts and neighbouring flats.

We write it so the freeholder's surveyor can review it quickly, and we will answer their questions.

Freeholder consent and Building Control are separate

Freeholder consent and Building Regulations approval are two different things, and structural work in a flat normally needs both.

Freeholder consent

Given by
The freeholder or managing agent, often as a licence to alter
They look at
The effect on the building, the common parts and the other flats
From us
A freeholder consent report

Building Control approval

Given by
The council or a registered building control approver
They look at
Whether the work meets the Building Regulations
From us
Wall removal calculations and drawings

Our wall removal calculations serve Building Control, and can be prepared at the same time as the consent report.

How it works

  1. Tell us what you plan. Send us a floor plan or a sketch, photos of the wall, and anything your lease or managing agent asks for.
  2. We inspect the flat. Our engineer looks at the wall and the structure around it. Seeing the flat above or the common parts can help, and we will tell you if it would make a difference.
  3. You receive the report. With calculations where required, written so the freeholder's surveyor can review it quickly.
  4. We answer their questions. If the freeholder's surveyor asks about the report, we answer them.

How the price works

The report is quoted per project. Send us photos and any floor plans and we will reply with a price; the quote is free and there is no obligation.

WhatPrice
Freeholder consent reportQuoted per projectfree quote
Calculations for Building ControlQuoted separatelycan be prepared alongside the report
Changes before calculations startFree
Revisions Building Control asks for within 50 daysFree
Other changes£180* per hour
Anything outside the original scopeQuoted separatelyneeds your approval first

* Prices are a guide only and VAT may be added. Contact us for an accurate price.

Work already done without consent?

If a wall has already come out, the freeholder may ask for a retrospective licence to alter. Our engineer can check how the alteration appears to be performing: see alterations with no Building Regs.

Common questions

Do I need the freeholder's consent to remove a wall in my flat?

Usually, yes. Most leases require the freeholder's consent for structural alterations, and many for any alteration at all. Check your lease, and if in doubt ask the managing agent.

Do I need consent to remove a non-load-bearing wall?

Often, yes. Many leases require consent for any alteration, structural or not. Check your lease, and if in doubt ask the managing agent. Our report can confirm that a wall is not load-bearing, which helps the freeholder agree quickly.

Is freeholder consent the same as Building Control approval?

No. They are two different approvals, and structural work in a flat normally needs both. Our wall removal calculations serve Building Control, and can be prepared at the same time as the consent report.

Will you need access to other flats?

Not usually, but seeing the flat above, or the common parts, can help confirm how the structure works. We will tell you if it would make a difference.

Tell us what you have found

Send a few details about the property and the problem. We read every enquiry ourselves and reply with the inspection or design service that fits, and its price.

  • Your price in writing before you book
  • Weekday and weekend visits across London
  • Report usually in 5 working days, or 48 hours with fast track

Request a quote

We reply by email with a price and the next available dates.

Call Book an inspection