Who does the calculations for removing a load-bearing wall in a London flat or house?
A structural engineer. Laytoe Structures, based in Chiswick, designs steel beams for wall removals in London flats and houses. One of our engineers visits, confirms whether the wall is load-bearing and what it carries, then designs the new support (a steel beam, lintel or box frame, with the posts and padstones it needs) and issues stamped calculations and drawings for Building Control and your builder. The engineering is quoted in writing after the visit, before any work starts.
Removing a wall in a flat: what is different
- Freeholder consent. Your freeholder will usually need to approve structural work. We can prepare a freeholder consent report alongside the calculations.
- The flats above. In a converted Victorian or Edwardian house, the wall may carry the floors and walls of the flat above, so we trace the load down through the building, not just your floor.
- Purpose-built blocks. Concrete frames and slabs are assessed differently, and are charged at £180 + VAT per hour.
- Party walls. If the beam bears on a wall shared with a neighbour, a notice under the Party Wall etc. Act 1996 is usually needed, and your party wall surveyor will want our calculations.
- Building Control. Approval is needed before the wall comes out. Revisions Building Control asks for within 50 days of us issuing the calculations are free.
We work across London from our office in Chiswick.
What we design
Pick the alteration you are planning.
Load-bearing wall removal
Knock-throughs between reception rooms and into kitchens. We confirm whether the wall is load-bearing and what it carries, then design the steel beam, lintel or box frame, with the posts and padstones it needs.
Chimney breast removal
Downstairs, upstairs or both, with support for any chimney left above. How chimney breast removal works.
Staircases, floor openings and joists
Staircase alterations and new openings in floors, and checks on floor joists for load-bearing capacity for new uses or heavy items.
Ceiling and roof openings
Openings in ceilings and roofs for skylights and roof lights.
Foundations for new loads
Foundations for new posts or walls carrying point loads.
Already removed a wall or chimney breast? We write retrospective reports for alterations already carried out, for example when you are selling a house where a wall came out years ago. See alterations with no Building Regs.
Who designs the support for a chimney breast removal in London?
A structural engineer. One of our engineers visits to see how the chimney breast and the floors around it are built, then designs the support for any chimney left above, such as a steel beam or steel brackets often called gallows brackets, and issues calculations and drawings for Building Control and your builder. The engineering is quoted after the visit.
Your builder needs to be there to open up, so we can see which way the joists run. In a leasehold flat, see freeholder consent reports.
Chimney breast removal
A chimney breast carries the weight of the chimney above it, often up through the bedroom and roof, so taking one out needs the remaining chimney supported.
Before
The breast carries the chimney above it down to its foundation.
After
A designed steel support under the remaining breast carries the chimney, so the ground-floor breast can come out.
- Building Control approvalBuilding Control will want to see a designed support, usually a steel beam or a box frame. Brackets, often called gallows brackets, are accepted only where calculations show they are adequate.
- Party wall noticeIf the breast is on a party wall, as in most terraces and semis, a party structure notice must be served under the Party Wall etc. Act 1996 at least two months before work starts.
- Your neighbour's fluesThe neighbour's flues must stay safe. We design the support and give you the calculations Building Control asks for.
Steel beam calculations for Building Control
Our steel beam (RSJ) calculations show the loads from the floors, walls and roof above, the size of beam needed to carry them, where it bears and on what, and the padstones and posts that take the load down to the foundations.
What you receive
- Stamped structural calculationsHow the new beams, posts, padstones and connections carry the loads safely down to the foundations.
- DrawingsGeneral arrangement and section drawings showing your builder what to install and where.
- Connection notesFor the steelwork.
We size the steelwork for your actual house rather than using a rule of thumb, which avoids beams that are too small or needlessly heavy. Building Control, whether the council or a registered building control approver, checks the calculations before work starts, then inspects the finished work. We answer their questions as part of the service.
How it works
- We visit. An engineer inspects the walls you want to remove and confirms whether they are load-bearing, and what they carry.
- You get a price. After the visit you receive a quote for the engineering, before any demolition starts.
- We design the support. Lintels, box frames or steel beams (RSJs), with the posts, padstones and foundations they need.
- Your package is issued. Calculations and drawings ready for Building Control, your architect and your builder.
- We stay involved. We answer your builder's questions, deal with anything unexpected found on site, and carry out final inspections. When the work meets our standards, we issue our engineer's completion certificate, which supports, but does not replace, Building Control's own completion certificate.
How the price works
The engineering is quoted after the visit, before any demolition starts. Prices assume traditional construction: load-bearing masonry walls and timber floor joists.
| What | Price |
|---|---|
| Calculations and drawings | Quoted after the visit |
| Concrete or other forms of construction | £180* per hour |
| Return visit, if your builder was not there to open up | £220*and the first visit is not refunded |
| Written report, if you need one | £180*not normally included |
| Further opening up or invasive investigation | £180* per houronly if agreed |
| Anything outside the original scope | Quoted separatelyneeds your approval first |
* Prices are a guide only and VAT may be added. Contact us for an accurate price.
Your builder needs to be there during our visit to open up the ceiling or wall where we ask, so we can see which way the joists run. Inspections are visual.
Planning permission and Building Regulations approval are your responsibility, and must be in place before the wall comes out.
What we need from you
- Photos of the wall or chimney breast, and of the rooms above and below.
- Any floor plans you have, even rough ones.
- Whether the property is a house or a flat, and whether it is leasehold or freehold.
If you are a leaseholder, your freeholder will usually need to approve the work too. We can prepare a freeholder consent report alongside the calculations.
A beam that bears into a wall shared with your neighbour will usually need a notice under the Party Wall etc. Act 1996. Your party wall surveyor will want to see our calculations, so it helps to have them early.
Already done without Building Control approval?
If a wall, chimney breast or extension was done without approval, a 2-minute film on what our engineer checks, and why a visual inspection is not a guarantee and does not replace Building Control approval.
What is not included
Unless your quote says otherwise, our design work does not include:
- Drainage design, above or below ground, and drainage pumps
- Temporary works and propping design
- Demolition method statements and risk assessments
- Steel-to-steel connections and steel fabrication drawings
- Steel coating details and proprietary products
- Staircases and balustrades
- Pile design, geotechnical design and site investigation
- Basement impact assessments and tanking specifications
- Construction traffic management plans
- Contamination and land remediation
Read moreShow less
Some elements, such as bespoke glazing, temporary works and steel connections, are normally designed by your contractor or a specialist. Party wall matters, and design after the Building Regulations package has been issued, are charged by the hour. The full terms are in our conditions of engagement.
Common questions
My builder says the wall isn't load-bearing. Do I still need an engineer?
Yes. Whether a wall is load-bearing often cannot be told by looking or knocking: joists, walls and chimneys above all affect it. A wrong assumption can lead to cracking, sagging floors or worse. An engineer confirms it, and Building Control will want the calculations if it is.
Do I need Building Control approval to remove a load-bearing wall?
Yes. Removing a load-bearing wall or chimney breast is structural work under the Building Regulations, so it needs approval and the work will be inspected. Our calculations are what Building Control will ask for.
Can I remove the chimney breast downstairs and keep the one upstairs?
Yes, as long as the chimney above is properly supported. Building Control will want to see a designed support, usually a steel beam or a box frame; brackets are accepted only where calculations show they are adequate.
Do I need a party wall notice to remove a chimney breast?
If the chimney breast is on a party wall, as in most terraces and semis, a party structure notice must be served under the Party Wall etc. Act 1996 at least two months before work starts. Your party wall surveyor will want to see our calculations, so it helps to have them early.
How much do steel beam calculations cost?
We quote for the engineering after the visit, before any work starts, because the price depends on what the wall carries and how the house is built. Extra charges, such as a return visit or a written report, are in the price table above.
What are the risks of removing a wall without approval?
Enforcement notices, costly remedial work, difficulty getting buildings insurance and problems when you sell. Buyers' solicitors look for the approvals, and missing paperwork can mean a last-minute price cut or an indemnity policy.
Will a missing engineer's certificate affect selling or remortgaging?
It can. Surveyors and lenders want written evidence that structural changes were designed and inspected properly, and some buyers withdraw or ask for a large discount without it. Our stamped calculations and engineer's completion certificate, together with Building Control's completion certificate, provide that evidence.
What if Building Control asks for changes?
Revisions Building Control asks for within 50 days of us issuing the calculations are free. After that, and for changes you make to the design once calculations have started, time is charged by the hour, and we will tell you before any extra cost is incurred. Changes you ask for after the visit but before we start the calculations are free.
Send the calculations to your Building Control body as soon as you receive them, so any questions are picked up early.
Can you help if the wall has already been removed?
Yes. A retrospective report assesses, as far as can be seen, what was installed and whether it appears adequate. Buyers' surveyors and lenders often ask for one when a wall or chimney breast has gone without paperwork. See alterations with no Building Regs for what we check.